Mike,
        You and the gang have built one substantial pavilion there. I can't wait to see the roof sheets go in place . Maybe they will be ready soon!

Ted Miles, very narrow gauge fan

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 3,629
  • Loco for 6
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #391 on: October 25, 2020, 02:17:37 PM »
Bill left out the important intermediate step between Zack and myself, as he brought the lumber from the saw and handed it up to me.

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #392 on: October 25, 2020, 07:36:43 PM »
Thanks Ted. We have a great bunch of very dedicated volunteers. It is always great working with everyone.

Hoping the weather holds long enough for us to get the roof on..
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #393 on: November 09, 2020, 07:50:03 PM »
I was in Home Depot tonight and an 8 foot 2x4 has dropped $2.00 too bad we are done..
Mike
Doing way too much to list...

John Kokas

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,393
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #394 on: November 09, 2020, 08:48:00 PM »
Mike, I think our need for lumber is far from over.  Keep the prayers going for the price to continue to fall.
Moxie Bootlegger

Bill Reidy

  • Museum Member
  • Conductor
  • *****
  • Posts: 992
  • Life member. Ack.
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #395 on: November 09, 2020, 09:47:06 PM »
Are we ever done with building (assuming next Trout Brook station and roundhouse)?  And Home Depot has decent lumber (well, maybe, at the bottom of the pile)?
What–me worry?

Graham Buxton

  • Museum Member
  • Brakeman
  • ***
  • Posts: 177
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #396 on: November 10, 2020, 12:21:45 AM »
Hmmmm, doesn't the WW&F own a sawmill?   And some timber land?  Shouldn't we be rooting for higher lumber prices?!?     :P
 
Think trainloads of cut lumber heading south from TOM to eager buyers!  ;D

.
« Last Edit: November 10, 2020, 12:29:48 AM by Graham Buxton »
Graham

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #397 on: November 10, 2020, 07:33:35 AM »
I know we are far from done buying lumber, I was just speaking of this one project.

Mike
Doing way too much to list...

John Kokas

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,393
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #398 on: November 10, 2020, 09:20:57 AM »
I know you were   ;D
Moxie Bootlegger

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #399 on: November 10, 2020, 02:15:28 PM »
Tentative schedule will be as follows..

11/14 Install blocks between the ends of the trusses, fascia board, metal drip edge and the rest of the bracing.

11/27 and 11/28. If the weather is good for both days and can get enough help, I'd like to get the roof installed. It may not take both days, but I think it will.

December. Siding.. And a good clean up of the remaining wood. Lots of it would make good fire starter..
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #400 on: November 15, 2020, 08:28:58 AM »
I will upload photos later today, but we got the trim up and the drip edge that goes above it, minus 5 feet we were short due to the building modification.

I did not get the extra bracing done I wanted, and may work on that next Saturday instead of skipping the day like I had planned, just to stay on the roof schedule.
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,735
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #401 on: November 15, 2020, 06:29:29 PM »




Mike
Doing way too much to list...

Bill Reidy

  • Museum Member
  • Conductor
  • *****
  • Posts: 992
  • Life member. Ack.
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #402 on: November 15, 2020, 08:46:32 PM »
Brilliant.  Thanks, Mike!
What–me worry?

ALAIN DELASSUS

  • Museum Member
  • Fireman
  • ****
  • Posts: 419
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #403 on: November 16, 2020, 07:53:44 AM »
You really make great strides with that pavillon Thank you for the pics and report.

Jeff Schumaker

  • Museum Member
  • Conductor
  • *****
  • Posts: 961
    • View Profile
Re: Event Pavilion for Alna Center - Official Reassembly Thread
« Reply #404 on: November 17, 2020, 04:15:28 PM »
Great photos, Mike. Things are moving along quickly.

Jeff S.