Author Topic: Mountain Extension Workday 11/10  (Read 4113 times)

Bill Reidy

  • Museum Member
  • Conductor
  • *****
  • Posts: 859
  • Life member. Ack.
    • View Profile
Re: Mountain Extension Workday 11/10
« Reply #15 on: November 11, 2018, 08:18:33 PM »
How's the drainage working on the extension, Mike?  I know you put a lot (I mean a LOT) of work into that this summer.  It's been plenty wet since fall work weekend.  Are you happy with results?
What–me worry?

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,331
    • View Profile
Re: Mountain Extension Workday 11/10
« Reply #16 on: November 11, 2018, 08:52:48 PM »
Yes, very pleased. Most culverts were flowing water yesterday, or you could tell they had water through them recently (grass laid flat in the ditch). After SWW 2019, I or anyone can walk through and just touch up the ditches with a shovel since they will still be soft, and most of the foot traffic will be over.
Mike
Doing way too much to list...