Mike Fox
Museum Member
Empire Builder
Posts: 5,642
Re: October 2018 Work reports
«
Reply #45 on:
October 09, 2018, 07:05:53 PM »
Great additional benefits to the crane. Ichabod is going to get rusty..
Logged
Mike
Doing way too much to list...
James Patten
Administrator
Superintendent
Posts: 4,225
Loco for 6
Re: October 2018 Work reports
«
Reply #46 on:
October 10, 2018, 05:53:15 AM »
Anticipated work for Saturday Oct 13:
Given that last weekend was FWW, I would expect a light volunteer presence.
* Board meeting at 4:00.
* Only 3 trains, on Saturday only.
* FWW cleanup
Logged
Mike Fox
Museum Member
Empire Builder
Posts: 5,642
Re: October 2018 Work reports
«
Reply #47 on:
October 10, 2018, 08:31:00 AM »
I would like to go to the Pinch Point and add to the drain pipe, then do some clean up there. In the afternoon I plan to work at Sheepscot, touching up where the conduit was buried, and maybe work by the container.
Logged
Mike
Doing way too much to list...
Paul Uhland
Museum Member
Dispatcher
Posts: 1,074
Re: October 2018 Work reports
«
Reply #48 on:
October 10, 2018, 11:23:34 AM »
Mike...is it allowed to clean up, remove un-needed bracing, etc, at Da Bridge?
Would be great to see it in a complete Builders Photo.
Logged
Paul Uhland
Mike Fox
Museum Member
Empire Builder
Posts: 5,642
Re: October 2018 Work reports
«
Reply #49 on:
October 10, 2018, 11:52:36 AM »
They have cleaned the bridge site and I thought had posted photos. Maybe I will venture that way too and take a few myself.
Logged
Mike
Doing way too much to list...
Joe Fox
Museum Member
Inspector
Posts: 1,276
Re: October 2018 Work reports
«
Reply #50 on:
October 10, 2018, 12:29:21 PM »
Yes, bridge site was cleaned up on 9/29 & 9/30. This included any blocks, ties, tools, etc.
«
Last Edit: October 10, 2018, 12:32:02 PM by Joe Fox
»
Logged
Alan Downey
Museum Member
Baggageman
Posts: 140
Re: October 2018 Work reports
«
Reply #51 on:
October 12, 2018, 08:12:14 AM »
I'll be continuing to work on the overhead crane installation in bays 1 and 3- primarily tsking measurements and starting to prep and drill the overhead segements. An extra hand or two would always be welcome.
Logged
Head of Jason Bothering Department
Shop Foreman
Fred Morse
Museum Member
Engineer
Posts: 642
Re: October 2018 Work reports
«
Reply #52 on:
October 12, 2018, 01:46:26 PM »
Today, Two pick-up truck loads of pile ends were cut up and taken to the transfer station by Steve Z. and I.
Logged
Fred Morse
Museum Member
Engineer
Posts: 642
Re: October 2018 Work reports
«
Reply #53 on:
October 12, 2018, 03:32:10 PM »
I forgot, 420 more ties arrived today. Gotta sharpen the chain saws!
Logged
John Kokas
Museum Member
Supervisor
Posts: 1,706
Re: October 2018 Work reports
«
Reply #54 on:
October 12, 2018, 03:53:23 PM »
I was about to get concerned Fred. Not a word about track materials for the SWW although there's work to be done. Not to mention we have a whole bunch of ties needed for crossing the bridge and a runaround track to build next fall!
218 OR BUST
Logged
Moxie Bootlegger
Fred Morse
Museum Member
Engineer
Posts: 642
Re: October 2018 Work reports
«
Reply #55 on:
October 12, 2018, 04:29:45 PM »
There was ballast being brought into Alna Center today also.
Logged
Joe Fox
Museum Member
Inspector
Posts: 1,276
Re: October 2018 Work reports
«
Reply #56 on:
October 12, 2018, 07:20:00 PM »
SWW we will be ballasting the track we built this Fall.
Logged
Mike Fox
Museum Member
Empire Builder
Posts: 5,642
Re: October 2018 Work reports
«
Reply #57 on:
October 13, 2018, 09:19:01 PM »
Work done today.
James showed up early and promptly left us to go get his trolley fix at Seashore Trolley Museum. He returned in time for the meeting.
Brendan moved some timbers around, Zack worked on the stairs and Fred played Gopher.
The Boom Truck and the red trailer were returned to Sheepscot this morning from the Mountain Extension.
The forklift was having a fuel issue, so Brendan and Jason tackled that after lunch. All fixed.
A little more room was made in the parking lot after lunch.
Allan puttered in the machine shop.
Enough riders to run all three trips.
Logged
Mike
Doing way too much to list...
Dave Buczkowski
Museum Member
Conductor
Posts: 981
Life Member
Re: October 2018 Work reports
«
Reply #58 on:
October 13, 2018, 09:48:33 PM »
Mike,
The 12:00 train was annulled for lack of passengers. We had visitors from Wisconsin, Long Island, Colorado and Indiana along with a few locals.
The Board endured a four hour meeting.
Dave
Logged
Fred Morse
Museum Member
Engineer
Posts: 642
Re: October 2018 Work reports
«
Reply #59 on:
October 14, 2018, 11:04:33 AM »
Mostly clean-up from work weekend. Stacked almost 100 good ties. Stacked for drying out. Lite rain most of the day. Took a number of ties of the flat car, these were ties removed last Spring. Hope to cut a few up to take to transfer station sometime this coming week. Trying to keep it to Two or Three loads per week. A lot of other work this coming week. Thanks for all the help Sat. in doing these hard jobs that have to be done. Fred.
Logged