Author Topic: News from the L&B's coach assembly line  (Read 124 times)

Wayne Laepple

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,484
    • View Profile
News from the L&B's coach assembly line
« on: September 27, 2018, 02:22:49 PM »
The folks at the Lynton & Barnstable's off-site carriage works are starting to build their next coach. Here's some photos:

http://www.lynton-rail.co.uk/trust/groups/pages/east-group-20th-september-carriage-no5-latest

Alex Harvilchuck

  • Museum Member
  • Hostler
  • ***
  • Posts: 220
    • View Profile
Re: News from the L&B's coach assembly line
« Reply #1 on: September 27, 2018, 04:34:20 PM »
I do like the modular construction methods! Extremely cool.