Thank you everyone for todays ROW efforts. Crew started out decent sized with 5 guys as we bolted the last 60' of track together, spike a few ties, and then brush cut the current built portion of the Mountain. After lunch, three of us went back out and cut the ROW from south of Humason to Trask crossing.
Didn't have much time to hang around the shop, but work continued uo north on the RoW repair, work on the temporary bridge spans, caboose cupola repair, and much more.