Anticipated work for Saturday Feb 3:

A cold stiff wind is forecast for this day.
* Trout Brook bridge zone tree clearing.
* Boxcar 67
* Archives

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: February 2018 Work Planning
« Reply #1 on: January 31, 2018, 08:06:16 PM »
Stiff wind from the south will help..

We have some trees to cut at the Trout Brook site. One big Pine, heavily leaning south I want to fall north...

Plenty of other bushes and brush that will be close to the fire. So plenty to keep several sombodies busy.

A good day will complete the tree cutting in the permitted area of the bridge. We can then start cleaning up to the north, between the bridge site and the road.
Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,285
    • View Profile
    • wwfry.org
Re: February 2018 Work Planning
« Reply #2 on: January 31, 2018, 08:14:29 PM »
Saturday will also feature an expedition, of sorts, at TOM. We will be laying out and mapping snowshoeing trails for the 2/17 Steam Train Snow Day.
Ed Lecuyer
Moderator, WW&F Forum

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: February 2018 Work Planning
« Reply #3 on: January 31, 2018, 08:25:06 PM »
Ed,
I can point you to a loop trail if you need..used to be an ATV trail. Take a saw with you. Almost can bet there is a tree down..
Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,285
    • View Profile
    • wwfry.org
Re: February 2018 Work Planning
« Reply #4 on: January 31, 2018, 09:07:17 PM »
Jason and Steve are planning the trail. I'm just drawing the map.
Ed Lecuyer
Moderator, WW&F Forum

John McNamara

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,587
    • View Profile
Re: February 2018 Work Planning
« Reply #5 on: January 31, 2018, 09:09:25 PM »
Tours of Porcupine Palace?

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,812
    • View Profile
Re: February 2018 Work Planning
« Reply #6 on: February 01, 2018, 04:46:01 AM »
Mike, 

The loop trail is what I had mind.  If you’d mark your recollection on a map Saturday morning, it’d be good to work from.  I was going to go up the mill spur and continue out to the Palace, then swing around the ridge above the Brook, then south and back west.

I don’t anticipate taking much crew away from you for long- but tree work is a priority.

Ed, can you email a topo map f the area that I can print?

Thanks,
Jason


Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: February 2018 Work Planning
« Reply #7 on: February 01, 2018, 08:42:42 AM »
Could be an after lunch adventure, when the cutting is done. I can give approximate on a map, but it won't be accurate. It will be about 15 minutes of walking.
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,225
  • Loco for 6
    • View Profile
Re: February 2018 Work Planning
« Reply #8 on: February 03, 2018, 06:15:41 PM »
Work done on Saturday Feb 3:

* Trout Brook tree clearing: We got rid of the big pine tree by the stream, but Mike couldn't make it go north because the chain kept breaking.  The third time the tree took a dive toward the stream.  Fortunately the ice was pretty thick so the tree didn't break through and people could walk around on the ice cleaning up the branches.  A few more trees were cut early to get the fire going.
* Top of Mountain: A crew went up after lunch to blaze a trail for the mid-month trains.
* Boxcar 67: Zack was working on that.

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: February 2018 Work Planning
« Reply #9 on: February 03, 2018, 07:33:32 PM »
Hopefully, what you are doing with the loop trail is to make it a permanent fixture at TOM, for snowshoeing in the winter, and hiking in the summer.  Ultimately, it should have clearing, blazing and ongoing maintenance to make it a permanent destination attraction for a broader audience than just railfans.

Bob

Stephen Piwowarski

  • Museum Member
  • Conductor
  • *****
  • Posts: 773
    • View Profile
Re: February 2018 Work Planning
« Reply #10 on: February 03, 2018, 09:07:50 PM »
It is so nice it is hard to imagine it any other way. When you get back in the woods, it really feels isolated and wild. We talked of converting the flagging tape to a more permanent blaze when we were out this afternoon.

Steve

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,225
  • Loco for 6
    • View Profile
Re: February 2018 Work Planning
« Reply #11 on: February 07, 2018, 07:10:50 AM »
Anticipated work for Saturday Feb 10:

* Boxcar 67
* Trout Brook to 218 tree trash burning (and cutting?).  There'll be a foot of snow on it.
* Board meeting 4:00

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: February 2018 Work Planning
« Reply #12 on: February 07, 2018, 12:19:56 PM »
The tree trash that is piled is all hardwood. We will have to handle it. There are some pine limbs to take down that could be used as fire starters, and a fir tree. A good day will clean it up.
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,225
  • Loco for 6
    • View Profile
Re: February 2018 Work Planning
« Reply #13 on: February 10, 2018, 07:21:57 PM »
Work done on Saturday Feb 10:

* Tree trimming: mostly limbing on the RR right of way south of Rt 218.
* Boxcar 67: Zack was working on grabirons.
* Backhoe/tie inserter: Jay was looking at things (the cylinders are back having been rehabbed).
* Giftshop: Linda was cleaning and organizing.
* Machine shop: Jason and Alan were hatching something...
* Plowing: The diesel plowed the line.
* Board meeting.

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: February 2018 Work Planning
« Reply #14 on: February 11, 2018, 12:50:24 AM »
Bet that tie inserter will save LOTS of drudgery out on the line, especially with more track coming.  ;)