If, during the week, someone could load 3 good rails from the rail pile onto a flat car, as well as the matching joint bars (6-6-6) to be ready to go North Saturday morning it would be great. 3 of the 4 rails that we hauled up are 65lb. And if they get delivered before Saturday that is good too.
Saturday, I really want to build that track to keep on schedule.