Work done on Saturday July 8:
* Car shop cleanup: the bays 2 and 3 shop floor is clean, now people are excavating ballast from it and redistributing it. More of that happened today. The dump tip car was filled with stone, and buckets were used to put other stone elsewhere. The N-S boards between the two bays were cut in two, as the concrete will now hold the vertical timbers in place. Those boards were then cut up for use on the Head Tide trail for bridges.
* Flatcar 118: The car was put on the turntable as Zack needed to get underneath with a long drill bit. He put on the second buffer block but needs to have the coupler dropped to push it fully in place.
* Ice Cream Social: We had a decent weather day, and excellent turnout - I think our best turnout yet. Having two trains helped with dropoff and pickup.
* Board meeting was held tonight. As usual we solved all our problems.
Now we just need money to do it!