Work done on Saturday June 3:
* Stone: About half of a flatcar of stone was delivered to about 90 feet of mainline near MP 7. It would have been the whole flatcar but I had to get back to Sheepscot for a particular time.
* Car 1015: Mike got the last wheel set on, and after some more fettling rolled it outdoors. After the last train it was moved to the West yard and the excavator was put on it.
* Earth works: Mike did some earth moving, dealing with the pile of gravel at the SE corner of the parking lot. Its now much more level.
* Passenger train: Coach 8 got turned around yesterday, and was on the train today. Diesel was turned halfway through the day.
There was probably a lot more going on but there was a lot I didn't see.