The ML&M siding would be their project as far as grading. We would or could do the surveying, but ML&M has a contractor that could do the work in our ROW as an easy addition to the work performed on the ML&M property. Our trackwork would end at the limit of our ROW.
The switch would have to be a north facing switch. Grade would be managable, but for safety a derail will be used. The open rail type. Could be like half a stub. But unless the ground firms up quickly, installing a switch may be all we can get done.
One add though Jason. Retaining wall at Humason?