95 feet of pipe from the car barn to the ditch. As soon as I broke the dam on the moat, James made a dash to the other end to watch the water come out. After the ballast pile is gone, I need to dig the ditch back out that runs down the east side of the car barn. It was filled in to allow access to Barry Lane, but by doing so has also made the water go under the wall of the car barn when it rains.