Author Topic: Relocating update to Gray?  (Read 9180 times)
John Kokas
Museum Member
Engineer
****
Posts: 634


View Profile
« Reply #30 on: January 15, 2015, 02:26:53 AM »

Having done track repair contracts myself, Wayne's numbers are quite realistic; probably tie replacement, ballast, line / level / tamp, bolts and tightening, and brooming/dressing.  All I can assume is that they are getting free rail, ties, jewelry, and associated shipping costs.
Logged
Carl Soderstrom
Museum Member
Brakeman
***
Posts: 189


View Profile
« Reply #31 on: January 15, 2015, 03:57:49 AM »

Could not MNG lift track panels from Portland and drop them in Grays?
Or is everything going to be operational before the move? Or a combination thereof.

Carl

« Last Edit: January 15, 2015, 03:59:24 AM by Carl Soderstrom » Logged
John McNamara
Operating Volunteers
Dispatcher
*****
Posts: 1,024


View Profile
« Reply #32 on: January 15, 2015, 04:52:17 AM »

A lot of MNG track is re-purposed standard gauge track with one rail moved in. At least in the early days, the city had a desire that the track be convertible back to standard gauge. With standard length ties and 85 lb/yd rail, picking it up would be a challenge. I don't remember if the joints are staggered, but if they are, that would make it even more fun.
Logged
James Patten
Wearer of Too Many Hats
Global Moderator
Trainmaster
*****
Posts: 2,655


Loco for 6


View Profile
« Reply #33 on: January 15, 2015, 12:11:10 PM »

At one point word was that MNG still wants a presence in Portland to run a train back and forth.  Whether this is still in the cards or not I don't know.
Logged
Vincent "Lightning" LeRow
Museum Member
Brakeman
***
Posts: 199



View Profile
« Reply #34 on: January 15, 2015, 04:03:08 PM »

MNGs current rail was pulled up from yard trackage and re-laid in it's current position.  The contract stated that we use standard gauge ties with one rail spiked in the running position for std. gauge track. (this directly led to the surfacing issues that MNG is dealing with now) The rail was worn when MNG acquired it and is even more so now.  To re-lay the 85 lb would be foolish, as it only has a few years of usable life left in it.
Logged

A spike saved is a spike earned.
Joe Fox
Museum Member
Engineer
****
Posts: 535


View Profile
« Reply #35 on: February 02, 2015, 01:33:19 PM »

What do they plan to use for rail?
Logged
Joe Fox
Museum Member
Engineer
****
Posts: 535


View Profile
« Reply #36 on: February 02, 2015, 01:38:25 PM »

Also read the online fund raiser you guys were doing only raised 1,265 of a desired 20,000. Any plan or fundraising ideas to try to get the rest of the money or additional money to help with the multi million dollar move?
Logged
Hansel Fardon
Hostler
***
Posts: 211


View Profile
« Reply #37 on: February 05, 2015, 09:24:50 AM »

Me and Bill aren't Boardmembers, we're just part of the steam crew.
Logged