W.W.&F. Discussion Forum
July 27, 2017, 03:48:22 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
Notice: Chasing our tales.
 
   Home   Help Search Login Register  
Pages: [1]
  Print  
Author Topic: Mechanised track relaying on the Ffestiniog  (Read 1550 times)
John L Dobson
Museum Member
Brakeman
***
Posts: 173


View Profile
« on: November 21, 2014, 01:10:11 PM »

See: https://www.facebook.com/festrail/photos/pcb.10154847544665716/10154847542580716/?type=1&theater

The site is at Dragon Curve on the Deviation Line above Dduallt. Sleepers (ties) and baseplates are life-expired and need replacing. The old ballast, which was a rather coarse material – the crushed arisings from boring the new Moelwyn tunnel in the 1970s – also needed replacing with better-graded material. The bogie wagons are class DZ low-sides from South Africa, originally bought for track-laying duty on the Welsh Highland, which have been renovated and fitted with new drop-down ends so that a JCB loader* can run from one wagon to the next to unload ballast. Three wagons are being converted for this work.

* Actually a small Komatsu on this occasion, I see on looking more closely at the photos!
« Last Edit: November 21, 2014, 01:21:14 PM by John L Dobson » Logged

John L Dobson
Editor, FR Magazine
James Patten
Wearer of Too Many Hats
Global Moderator
Trainmaster
*****
Posts: 2,658


Loco for 6


View Profile
« Reply #1 on: November 21, 2014, 03:32:56 PM »

That's a cute little loader!
Logged
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006-2008, Simple Machines Valid XHTML 1.0! Valid CSS!