Author Topic: Car Barn - Official Work Thread  (Read 189539 times)

Steve Smith

  • Museum Member
  • Engineer
  • ****
  • Posts: 649
  • Life Member
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #210 on: October 07, 2015, 06:31:43 PM »
Actually the rivet wasn't all done in that last picture. Needed to be peened--I guess that's the proper term--to be flatter like the others already done. I believe that was accomplished shortly after my camera battery quit.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #211 on: October 08, 2015, 05:54:43 AM »
Nice to see the riveter in action
Mike
Doing way too much to list...

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,071
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #212 on: October 13, 2015, 06:47:17 PM »
Car barn siding loaded up at the sawmill last Thursday along with 3 switch stands we were allowed to salvage from an old industrial property in Massachusetts.





Sitting in traffic on the Zakim bridge in Boston.



Car barn progress as of 10/13/14.









Car barn siding stacked in the yard,



United Timber Bridge Workers, Local 1894, Alna, ME

Fred L. Kuhns

  • Museum Member
  • Hostler
  • ***
  • Posts: 222
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #213 on: October 14, 2015, 01:01:06 AM »
 Brendan, again thanks for safe and just in time delivery of the car barn siding. The pictures are just great, and to see the siding up on the car barn in a matter of days shows the great effort of all our volunteers. Nice to see the effort in stacking the balance of the lumber, will help the drying progress and allow the material to remain stable. Fred L. Kuhns

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #214 on: October 16, 2015, 03:17:48 PM »
Brendan...Thanks for the detailed photo story of the car shop track and siding work, which continued through substantial rain. Hope your camera didn't blow up.  :D
Also the section house--looks fantastic, can I move in?  ;D
However, its roof looks unfinished. Thought it was.
Paul Uhland

Bill Sample

  • Museum Member
  • Fireman
  • ****
  • Posts: 344
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #215 on: October 21, 2015, 10:11:20 AM »
Maybe the light passing through the skylights makes it look unfinished.
 

Dave Crow

  • Museum Member
  • Fireman
  • ****
  • Posts: 390
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #216 on: October 21, 2015, 10:38:06 AM »
I think Bill Sample is asking about the roof for the Whitefield Section House...

Will it have shingles or cedar shakes for the roof?

Dave Crow

PS.  Save three 12-foot pieces of 33# rail so we can machine the switch points; I have three down here in Baltimore already.

Stephen Piwowarski

  • Museum Member
  • Conductor
  • *****
  • Posts: 773
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #217 on: October 21, 2015, 01:26:15 PM »
Hey Dave,

It won't have shakes nor shingles. Original images of the building show a roof of rolled roofing which had the seams tarred. This is what the replica has. It has already been installed.

Bill is referring to the clear panes which were alternated between the opaque roofing panels.

Steve

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,071
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #218 on: October 21, 2015, 06:44:46 PM »
Car barn as of 10/21/15.







United Timber Bridge Workers, Local 1894, Alna, ME

Wayne Laepple

  • Museum Member
  • Yardmaster
  • *******
  • Posts: 2,123
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #219 on: October 21, 2015, 06:47:45 PM »
Hey, wait a second! When did No. 65 come back from Wiscasset?

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,025
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #220 on: October 21, 2015, 08:13:13 PM »
This afternoon.

Wayne Laepple

  • Museum Member
  • Yardmaster
  • *******
  • Posts: 2,123
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #221 on: October 21, 2015, 08:15:59 PM »
I presume there will be shuffling around of equipment before winter comes. I understood that track one was for the passenger train.

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,025
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #222 on: October 21, 2015, 08:18:19 PM »
Yes, the freight cars are on track 1 temporarily. 

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,812
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #223 on: October 21, 2015, 08:23:42 PM »
As soon as we get guard rails in we'll rearrange.  We know where we want everything- just want to able to use the north yard without having to inch through every switch.

See ya
Jason

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,071
    • View Profile
Re: Car Barn - Official Work Thread
« Reply #224 on: October 31, 2015, 08:35:02 PM »
Battens starting to go up on the south wall.



United Timber Bridge Workers, Local 1894, Alna, ME