Current News
Quote from: Stewart "Start" Rhine on August 14, 2014, 04:43:51 PMMuch work has been done this week, especially with the injector piping. Please go to the museums' facebook page for photos and to find out who put in A LOT of time on the project. Hint: His name begins with J but it's not Jason Stewart,Could you please post some of the photos here as some of us don't have a face book account and with out one they will not let look at the photos.Andre
Much work has been done this week, especially with the injector piping. Please go to the museums' facebook page for photos and to find out who put in A LOT of time on the project. Hint: His name begins with J but it's not Jason
This week - * Brendan threaded the lower boiler drains and installed the bronze plugs. * Steam header pipes were installed in the smokebox. The blast pipe was test fitted and Jonathan made a new stand off plate for the blower nozzle. A new blower nozzle and supply line were test fitted. * Jason and Jonathan had filled the boiler last week. They heated the boiler (between 70 and 100 degrees) and ran a hydrostatic test up to a pressure of 140. The test went fairly well with most of the new steam connections holding but there were some leaks. * Tank - Brendan has been working on the internal braces. New flat stock arrived this week and Brendan is making new braces using the old pieces as templates.