2555
« on: January 19, 2013, 06:15:01 PM »
Work done on Saturday Jan 19:
* Restrooms: Zack continued piping, and installed the gas heater for the hot water. Steve Z and Dave B sanded the walls.
* Trees: Several trees were cut, and after several false starts we got a fire going. The trees were by the future car barn, with some leaning trees by the spur also cut.
* #9: Jason had several minions working under him: lathe work, drilling, measuring, etc.
* Rail: Two lengths of rail were dug out of the light snow and moved to the end of track, for someone to pick up later.
* Show prep: John R and Bob C were loading up boxes from the gift shop for the Springfield show, which is next weekend.