Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - Dwight Winkley

Pages: [1] 2 3 ... 17
1
Volunteers / Re: November 2017 Work Planning
« on: November 26, 2017, 06:53:35 PM »
Prebles will stay where it is now located. Visitors for special events go to this Ticket window to get their boarding pass for the next train North. Track 1 (or A) at Sheepscott Station or Track 2 ( or B) beside the Car Barn.  The ticket agents do have heat, but not much with the window (upper half of the door) open all the time.

2
Volunteers / Re: November 2017 Work Planning
« on: November 22, 2017, 09:52:22 PM »
One short section (about 6 ties) of the woods track was skipped before the Woods Shed. ROW has a high spot. Clay needs to be dug out before stone is added to ROW

3
Volunteers / Re: November 2017 Work Planning
« on: November 20, 2017, 08:37:00 PM »
We have a few metal parts that can be reused. Some require work. But not a complete set of metal parts for one box car.

4
Volunteers / Re: November 2017 Work Planning
« on: November 19, 2017, 06:47:58 PM »
The steel for 67 has arrived from our suppler. It is on the floor of bay 3.

5
Volunteers / Re: November 2017 Work Planning
« on: November 08, 2017, 02:09:42 PM »
Fred wants to take 52 and a empty flatcar north. Stopping on the way to pick up the used ties that were removed this summer. These ties will be used as ground ties for more tie piles next year at saw mill spur.
There is one pile of ties that is not stacked correctly, plus a few loose ties laying on the ground and this will be corrected.
dwight

6
Plant in June. Harvest now.  About every town had a potato storage barn located near the railroad.

7
Work and Events / Re: Shop Building Improvements - Official Work Thread
« on: September 17, 2017, 08:21:13 PM »
sealer

8
Work and Events / Re: Shop Building Improvements - Official Work Thread
« on: September 17, 2017, 02:55:43 PM »
John. New floor already had two coats. See photo's above. Fred is standing on the coated concrete.

9
Work and Events / Re: 2017 Fall Work Weekend Projects
« on: September 13, 2017, 01:17:54 PM »
Hi Paul, I don't recall that we have any high mainline switch stands that you stand between the switch stand and the track. You stand to the side and move the stand handle away or towards the tracks.   

MMMMM! we do have one or two very low yard switch's If they have a stand it only a few inches tall. Guess you could lean over and line the switch while standing near the tracks. These low switches are located in Sheepcot lower yard.
dwight

10
Volunteers / Re: September 2017 work planning
« on: September 10, 2017, 01:51:34 PM »
Yes, see Mike's Sept. 10th report in Down The Mountain To Trout Brook. Work and Events.

11
Work and Events / Re: Trout Brook Bridge - Official Work Thread
« on: September 08, 2017, 02:42:04 AM »
Resize the bridge. Only the two pony trusses have been built. To resize the bridge, new deck timbers etc. will be ordered with a length shorter than standard gauge size.
New deck will be 10 feet wide between Trusses.

12
Work and Events / Re: Shingle Mill - Official Work Thread
« on: July 28, 2017, 01:05:37 PM »
Wed. July 25th. On my way to the museum from my home I passed the site of the original shingle mill.

The shingle mill building plus a small garage building used for storage have been torn down. I would say by hand, as all the tree's growing around both buildings were not disturbed. The old farm house is still standing.

13
Work and Events / Re: North Yard Project - Official Work Thread
« on: July 28, 2017, 12:58:09 PM »
On Thursday 27th in the North Yard two rails were bent with the museum hand powered screw rail bender. After the two rails were bent both joint bars were installed.
At the same turnout two switch points were set on the ties. We than put the slide plates  under the rails. Of course nothing go right, so a lot of little thing keep getting in the way, like track spikes in the wrong place and the spikes had to be removed

14
Work and Events / Re: Roundhouse - Official Work Thread
« on: July 14, 2017, 02:45:00 PM »
Hi Ted. Am not sure if we have the original plans, someone else can answer that question. We do have photographs.

I do know original Wiscasset  roundhouse had three tracks. When you stand on the turntable and look at the roundhouse the original roundhouse had the run thou track on the left hand track. The museum will build the new roundhouse with the run thou track on the right hand track. This track is in service at the present time, it runs from the North Yard.

15
Museum Discussion / Re: Annual Picnic Advice requested
« on: July 07, 2017, 02:08:26 AM »
There will be members at the museum on Friday the 11th, working to setup for the Annual Picnic. Could be switching of equipment to get the trains ready for Sat. morning.

Pages: [1] 2 3 ... 17