Author Topic: Mountain Extension - Official Work Thread  (Read 235795 times)

Graham Buxton

  • Museum Member
  • Flagman
  • *
  • Posts: 34
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1065 on: October 07, 2019, 03:57:54 AM »
While the 'headache rack' at the front of the [former] Copeland truck  load bed may still say "Copeland ...", I see that at least the driver's door has been re-lettered for the WW&F.  See this photo that Mike Fox posted earlier (2nd page back of this thread):

Graham

Graham Buxton

  • Museum Member
  • Flagman
  • *
  • Posts: 34
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1066 on: October 12, 2019, 12:22:29 AM »
I'm going to post some FWW tracklaying related photos, but these will be some of the less exciting but still necessary activities that occur before the rails can be placed.


Ties were cut to length an stacked earlier at TOM (Top of Mountain) in large stacks. But to work with Elmer Gantry, the ties need to be bundled in stacks of 14 so they can be strapped together with a 'spreader bar with a lifting loop'.


Note: These photos are 'clickable' thumbnails; click to see larger.


Here we see  ties stacked in groups of 14 sufficient for most of the next two days:




Here we see Elmer Gantry preparing to load some of the tie stacks:

[/url[/size]
]
Details of the strapped bundles with the spreader on top, and the Gantry's chainfall moving a bundle aboard the flatcar.




Here we see a tie bundle being unloaded from Elmer at the current temporary end-of-track:



Once the bundle is set down and the straps released, additional rails will placed.

As of Friday PM, rails are perhaps now about 40 feet south of the Trout Brook bridge (means rails have not yet crossed the bridge).

Finally, a couple of spike maul 'handles' that "gave their all" today:

« Last Edit: October 12, 2019, 01:06:04 AM by Graham Buxton »
Graham

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,246
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1067 on: October 12, 2019, 12:36:58 AM »
Thanks Graham. Looks like things are going well.
Mike
Doing way too much to list...

ALAIN DELASSUS

  • Museum Member
  • Hostler
  • ***
  • Posts: 270
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1068 on: October 12, 2019, 06:30:08 AM »
Thanks Graham for those interesting backstage photos and captions.

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,246
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1069 on: October 13, 2019, 12:58:38 AM »
I arrived early, and had the truck running before daylight. Wanted to get right up there and get the last grading done before the rails started flying.

First thing I did was use the boulder as a ramp to load the Kubota. No pictures of the loading because I was too busy hanging on to get off and snap a shot.





Then I spent about half an hour finishing dozing, leveling the low spot. Then I lugged a bale of hay to South of the bridge to cover over the material I placed last weekend.

Dropped the Kubota at Alna Center before lunch, using the piles of ballast as the ramp.



Back north in the afternoon to check on progress and visit. Steady climb from the bridge.



Mike
Doing way too much to list...

ALAIN DELASSUS

  • Museum Member
  • Hostler
  • ***
  • Posts: 270
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1070 on: October 13, 2019, 05:57:49 AM »
Hello Mike I do wonder how you  have loaded the Kubota in reverse at that.

Mike Fox

  • Museum Member
  • Superintendent
  • ********
  • Posts: 4,246
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1071 on: October 13, 2019, 12:51:07 PM »
I used the bucket to lift up one end of the machine at a time. I got one set of wheels on the truck, then spun around and raised the other set of wheels up to get on the truck.
Mike
Doing way too much to list...

ALAIN DELASSUS

  • Museum Member
  • Hostler
  • ***
  • Posts: 270
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #1072 on: October 13, 2019, 02:10:18 PM »
Thanks Mike. No wonder you did not have the time to take a pic. It was not at all the right moment to capsize the Kubota.