Author Topic: Trout Brook Bridge - Official Work Thread  (Read 59491 times)

Joe Fox

  • Museum Member
  • Conductor
  • *****
  • Posts: 978
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #795 on: September 28, 2018, 06:09:59 PM »
Yes, there are some trees and trimming to be done this winter along the RoW to Trout Brook.

Job well done to everyone involved. What a crazy and tense summer as the Bridge used up most of our volunteer resources. I am still working on setting up my schedule for FWW, and I cant wait to go show my presentation I am putting together. Everyone has done a tremendous job this summer and it is absolutely amazing.
Track laborer, roadmaster, general laborer, and much more.

Paul Uhland

  • Museum Member
  • Conductor
  • *****
  • Posts: 763
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #796 on: September 28, 2018, 06:24:31 PM »
Wowee...onto the next biggie, tracklaying project, before Mister Snow blows into town.
Take the wintor off, guys.  ;D
Paul Uhland

Kevin Kierstead

  • Museum Member
  • Gandy Dancer
  • *
  • Posts: 21
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #797 on: September 28, 2018, 06:28:34 PM »
I'll be up Fri. am for the weekend. count me in

Paul Uhland

  • Museum Member
  • Conductor
  • *****
  • Posts: 763
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #798 on: September 28, 2018, 08:38:34 PM »
Also...congrats to WW&F planners and organizers Jason, Mike, Joe, others who got approvals, ordered materials,  set work sessions, invented work-saving devices, got-er-all-done; contractors who worked rail help into busy schedules.

Amazing.

Paul Uhland

James Patten

  • Global Moderator
  • Superintendent
  • *****
  • Posts: 3,084
  • Loco for 6
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #799 on: September 28, 2018, 10:15:34 PM »
Over the winter we need to cut back the trees between the end of track and the bridge, and I guess we will cut additional trees in the right of way where we will be laying track, as trees were left behind to provide guidance to backing trucks.

Next year we have more road bed repair, including fixing the ditch along the straightaway south of the bridge.

Bob Holmes

  • Museum Member
  • Fireman
  • ****
  • Posts: 309
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #800 on: September 28, 2018, 11:39:45 PM »
Taking winter off is not in our DNA.  It's a great time to do tree clearing and burning...

Al Michelis

  • Museum Member
  • Flagman
  • *
  • Posts: 46
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #801 on: September 29, 2018, 12:41:49 AM »
Taking winter off is not in our DNA.  It's a great time to do tree clearing and burning...

And a lot of organizing and clean up around Sheepscot and the ROW.  We aren't knee deep in snow all winter and there is lots to get done before Spring.  So if you are feeling house bound, closed in and need to get out - you know where we are.

Paul Uhland

  • Museum Member
  • Conductor
  • *****
  • Posts: 763
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #802 on: September 29, 2018, 04:52:30 PM »
Uh, Bob...that was my attempt at ironic funniness. I'm well aware there's always loads of WW&F tasks needing attention, are well taken care of by available volunteers.
Good luck with work through the winter.
Paul Uhland

Bill Reidy

  • Museum Member
  • Engineer
  • ****
  • Posts: 663
  • Life member. Ack.
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #803 on: October 30, 2018, 11:15:16 AM »
Down East magazine's Maine Dispatches column for November includes mention of the bridge move.

https://downeast.com/maine-news-november-2018/
What–me worry?

Stephen Piwowarski

  • Museum Member
  • Fireman
  • ****
  • Posts: 414
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #804 on: October 30, 2018, 03:15:11 PM »
Yay for a second mention by Down East this year. Just in case there was extensive concern over the lack of publicity specifically in relation to the Trout Brook move (it was covered in the local papers), since we have decided to look at the "Mountain Extension" as a whole, there will be a large media focus when we open the railway to Trout Brook Station, including the bridge, extended track, right of way work, connection with Midcoast Conservancy and our overall aim of restoring service on the WW&F.

Rebuilding a railroad is a huge project, and I am continually impressed to see how we have made strides on the restoration of this one. May we continue to experience such success and meet like minded people who would like to come and join us.
« Last Edit: October 30, 2018, 03:18:57 PM by Stephen Piwowarski »